Tile Shower Door Installation

Our shower doors are customized for your space so having a new one ordered fabricated and delivered could take up to 3 weeks.
Tile shower door installation. Attach the seal strip to the bottom of the door and cut it to the required length. Turn over the trowel to the notched side and comb over in one direction. Measure the inside width of the shower at the top surface of the tub ledge from wall to wall. Attach the door handles and any towel bars.
Shower tile and shower tiling supplies will cost about 600 if you choose standard tile. Clean the tile surface with a household cleaner to remove any film or dirt from the tub ledge and tile surfaces. Continue reading below our video of the day. Use a small amount of the excess mortar and spread it onto the back of a tile with the notched.
Drill proper holes into the walls for the side rails. Place the glass clamp sweep into place on the door s bottom edge and secure it at the door clamp. Tap a plastic anchor into the pre drilled holes in the tile image 3. Follow the steps necessary to determine where the holes need to be for your anchors.
The shower tiling alone will take two days. Use a hacksaw to. Run a damp sponge over the backer board in the area you intend to tile. Run a bead of silicone on the underside of the threshold piece image 1.
Make a mark on the tile for the spots where you will be drilling. Make sure that all of your measurements are level and figure out exactly where the hinges for the door will be going. Place end caps on the tops of the wall channels. Put it in place and tape it down until the side rails are in place image 2.
How to tile a shower like we show here will take you about four full days. Spread thin set along the first section of your tile row.